In a modern manufacturing business, efficiency is crucial for competitiveness. But how do you actually measure how efficiently your production equipment is running? This is where OEE (Overall Equipment Effectiveness) comes in.
OEE is a globally recognized method for measuring and optimizing production performance. For production and IT managers, OEE is a crucial KPI that enables them to identify production challenges, eliminate bottlenecks and optimize the production process.
When you combine OEE with MES (Manufacturing Execution System), a powerful data-driven approach to production optimization is created.
What is OEE?
OEE is a method to make the efficiency of the production process measurable. OEE measures how much of the planned production time actually results in good products without waste.
OEE is therefore an important metric that shows how efficiently a machine works in relation to its maximum potential.
A key part of the OEE calculation is to identify and measure the losses and stop causes that affect machine operation. OEE is therefore not just about presenting facts and figures, but also serves as a practical tool to identify areas for improvement.
By analyzing and reducing the various loss factors, you can optimize machine utilization and increase productivity.
The three main elements of OEE
- OEE Availability – How much of the planned production time the machines are actually available.
- OEE Performance – How close production is to maximum capacity.
- OEE Quality – The percentage of units produced that meet the quality requirements.
OEE is calculated as:
OEE = Availability x Performance x Quality
The six big losses in OEE
To improve OEE, it is necessary to understand the six major losses that typically reduce production efficiency. These losses are divided into the three main categories:
Availability Loss
- Unplanned stops – Breakdowns, mechanical failures, software errors or missing spare parts that cause production stops.
- Planned stops – Switching between products, machine calibration and process adjustments. These stops can be reduced with SMED (Single-Minute Exchange of Die).
Performance Loss
- Microstops – Short unplanned stops on machines due to material flow, sensors or manual intervention.
- Reduced speed – Machines running below optimal speed due to wear, poor maintenance or inefficient setups.
Quality Loss
- Faulty production – Defective products discovered during production. Defects can be reduced with automated quality control.
- Start loss – Waste from warm-up, calibration or start-up after a stop.
What can you do to best handle the six big losses?
- Automated data collection with e.g. MES, IIoT ensures accurate detection of stop causes.
- Predictive Maintenance minimizes breakdowns and reduces unplanned downtime.
- LEAN methods (SMED, Kaizen, Six Sigma) optimize process flows and reduce changeover times.
- Real-time OEE monitoring provides insights so management can act proactively.

Why is OEE important?
By measuring OEE, your manufacturing business gets:
- Objective data instead of subjective assessments of production performance.
- Identify bottlenecks so resources can be prioritized correctly.
- Foundation for continuous improvement through Lean Manufacturing and Six Sigma.
- Better decision-making based on real-time data.
All of this will help your manufacturing business answer key questions that are often asked in management meetings and boardrooms. For example, it could be:
- Why aren’t we producing as much as we should?
- Where do the biggest losses occur?
- Which machines or processes require optimization?
OEE calculation in practice
We’ve covered what OEE is and why it’s important. Now we’ll look at how OEE is actually calculated.
Availability
Formula
Availability % = (operating time ÷ planned production time) X 100
Typical sources of losses are machine breakdowns and changeover time.
Performance
Formula
Performance = (ideal cycle time ÷ actual cycle time) X 100
Typical sources of loss are speed loss and short stops.
Quality
Formula
Production Quality = (quality units ÷ total units) X 100
Typical sources of efficiency loss: Production errors, rework.
Example of OEE calculation
Let’s say a production line has the following numbers on a production day:
- Planned production time: 8 hours (480 minutes)
- Runtime: 6 hours (360 minutes)
- Ideal cycle time: 0.5 minutes per device or 30 seconds.
- Actual output produced: 600 units
- Actual cycle time = 360 / 600 = 0.6 minutes per device or 36 seconds.
- Approved units: 570 units
Calculation:
- Availability = 360 / 480 = 75%.
- Performance = 0.5 / 0.6 = 83.3%
- Quality = 570 / 600 = 95
- OEE = 0.75 × 0.833 × 0.95 = 59.4%
How should the OEE result be interpreted?
An overall OEE score of 59.4% is not unusual for an average manufacturing company, but it shows that there is significant room for improvement.
- The availability of 75% indicates that the machine is out of service for 25% of the planned production time – here you should investigate breakdowns and changeover time.
- The performance of 83.3% indicates that the equipment is not running at full capacity. The reasons could be microstops or reduced speed.
- The 95% quality is solid, but still below ideal levels for many industries.
An OEE level around 60% is typical for companies that do not yet have full real-time insights and structured improvement processes – e.g. via an MES system.
However, the benchmark for OEE in manufacturing companies varies depending on the industry, production methods and the maturity level of process optimization. However, below are some general guidelines.
General OEE benchmarks
World-class OEE: 85% or higher
- Rarely achieved without advanced automation, predictive maintenance and strong process optimization.
- Requires continuous improvement and strong integration between IT and OT systems.
Average OEE in production: 60-75%
- Most thriving manufacturing companies are in this range.
- There is room for improvement, but the company is already at a good level.
Low OEE: Less than 60
- Often indicates inefficient processes, frequent stops, long changeover times or quality issues.
- Typically in companies without full automation or without an MES system to monitor and analyze production.
It’s important to note that low OEE figures do not necessarily mean that the company is inefficient. In pharma, for example, strict quality requirements and control are highly valued, which naturally has a negative impact on output.
OEE and MES: A powerful combination
OEE is a powerful KPI, but its value depends on accurate data. This is where MES (Manufacturing Execution Systems) play a crucial role.
How MES improves OEE calculation:
- Automatic data collection eliminates manual errors in recording production stops and performance.
- Integration with sensors and PLCs provides real-time data for accurate measurements.
- MES can use root cause analysis to identify precise causes of low OEE, such as specific machine breakdowns or quality issues.
- Integration to ERP and SCADA allows OEE data to be linked to business systems for a complete production analysis.
How can companies improve their OEE?
- Identify and eliminate the biggest losses by focusing on the six major losses in production.
- Automate data collection via MES and IIoT
- Use real-time dashboards and AI to optimize production. Visualizing OEE data can help you make faster decisions.
- Implement predictive maintenance
- Set realistic goals for OEE improvement.
Conclusion
When OEE is combined with real-time data from MES, manufacturing companies get a powerful tool for continuous optimization of production.
Are you ready to take the next step towards a more digitalized and optimized production? Contact Niels Nyhus at nn@integra2r.com or +45 2963 8313 to learn more about how MES can help you boost OEE figures in your production.